Cross-Dock Services in Charleston, SC
In one dock, sorted on the floor, out the other side same day.
Same-day cross-dock in Charleston at the Ladson SC warehouse and the Hanahan SC warehouse — receive, sort, and tender freight back out without warehousing it in between. Inbound drayage runs from Wando Welch, North Charleston Terminal, and Hugh K. Leatherman. Built for retail compliance windows, DC-bypass moves, and time-defined consolidations since 1998. Container transloading is the port-direct version: container off the chassis, devanned on the dock, straight to outbound staging.
Port of Charleston cross dock, from both buildings.
Cross-dock in Charleston runs from both floors. The primary building is the Ladson SC warehouse, 60,000 sq ft at 137 Acres Drive. The Hanahan SC warehouse, 30,000 sq ft at 1014 Northpointe Industrial Blvd, is closer to the port terminals — the shortest drayage runs in our network. Inventory moves between both buildings as needed. Same WMS, same crew, same phone number. Inbound drayage is from Wando Welch, North Charleston Terminal, and Hugh K. Leatherman. The miles below are the per-building figures already published on the facility page and the Port of Charleston terminals guide.
Hanahan — closer to the terminals
- Wando Welch
- ~16 miles — across I-526.
- North Charleston Terminal
- ~7 miles — minutes away.
- Hugh K. Leatherman
- ~6 miles — the closest terminal to this facility.
Ladson — primary building
- Wando Welch
- ~24 miles — short-haul drayage via I-526.
- North Charleston Terminal
- ~14 miles — quick run down I-26.
- Hugh K. Leatherman
- ~14 miles — direct access off I-26.
Both facilities sit within 25 miles of all three SC Ports Authority ocean terminals. Peak throughput across both locations is 30 containers/day. Devanning, reworking, and cross-dock are scaled by product mix.
Container transloading in Charleston.
Container transloading in Charleston is the port-direct devan and cross-dock. The container comes off the chassis, is devanned on the dock, and the freight moves straight to outbound staging — no put-away, no rack pull, no second touch. It pairs with the same-crew drayage and devan pattern. The cargo touches the warehouse floor, but it doesn't dwell.
A plain-language walkthrough of that handoff — how it differs from cross-dock, devanning, and deconsolidation, and how the container moves from Wando Welch, North Charleston Terminal, and Hugh K. Leatherman — is the transloading Charleston guide.
From inbound gate to outbound seal in four steps.
Cross-dock isn’t put-away in a hurry — it’s a different dock plan from the start. Cargo is staged for movement, sort criteria are loaded before the inbound arrives, and the outbound carriers are sequenced against the sort.
- STEP 01
Pre-receipt + dock plan
Before the inbound arrives, we ingest the ASN or load list and sketch the dock plan — which inbound door it lands on, which outbound doors the sort flows toward, and which carriers are scheduled to pull when. The cargo is staged for movement, not for storage.
- STEP 02
Receive + count
Inbound is unloaded onto a striped staging zone, piece-counted (or pallet-counted, depending on the format) against the ASN, and any short / over / damage is flagged immediately — before the cargo gets blended into the sort.
- STEP 03
Sort to outbound
Cargo is sorted live to the destination criteria — by SKU, by store, by route, by customer, by retailer DC — labeled to the downstream WMS's spec, and walked across the dock to the outbound staging lane for the carrier that's pulling it.
- STEP 04
Tender + ASN out
Outbound carrier checks in, we generate the BOLs, fire the outbound ASN to the receiving DC, and the load leaves. Cargo touches our floor, but it doesn't dwell — clock starts at the inbound gate, ends at the outbound seal.
Four situations where the no-storage shape pays off.
When the receiving big-box DC has a tight delivery window and the inbound from the port doesn't line up cleanly, cross-dock turns one big inbound into several appointment-perfect outbounds without paying for storage in between.
Cargo is already destined for known stores or regional DCs — sending it through your own warehouse first just adds touches. Cross-dock at the port instead, and outbound straight to the final stop.
Multiple inbounds (LCL, less-than-truckload, parcel, container loads) need to be combined into one outbound load by a specific time. We hold the dock plan open until the last piece arrives, then sort and tender as a single move.
Container off the chassis, devanned on the dock, and the freight moves straight to outbound staging — no put-away, no rack pull, no second touch. Pairs naturally with the same-crew drayage and devan pattern.